Survey and Inspection of the technical condition of the civil protection protective structure and report and future recommendations.


The purpose of survey  and inspection is to create a technical report on the inspection of the object with conclusions on the technical condition of building structures, special protective devices, engineering systems and recommendations for further safe and reliable operation.

 

Actions that are usually performed during the survey:

  • Analysis of the initial available data: conditions, available documentation for the object of examination, materials of past surveys, measurements, etc.

  • Detailed inspection of shelter structure and detection, measurement, sketching and photographing of the existing defects and damage. Identifying the possible causes for the damage and the current dynamics of the defects in the structure into more severe.

  • Instrumental inspection and testing of the strength of materials (concrete, connections, rebars etc.) of the structure (shelter).

  • Visual inspection of the engineering systems: ventilation systems, pipelines,  components of  the fire alarm system, power cables, etc.

  • Evaluating the need for additional more deep inspection due to the findings.

  • Analysis of the results of the survey, preparation of a report with extended conclusions and recommendations on the technical condition and further reliable operation of the shelter and/or the volume of defects that need to be fixed.

  • Compilation of a technical report and recommendations.

 

Information and instruments for the survey:

  • Ownership of the shelter / real estate and technical documentation for protective structure of civil protection (civil defence) shelter.

  • Documentation of previous inspections and technical condition of the civil defence shelter.

  • General characteristics of the areal conditions (snow load, wind load (Pa), etc.)

  • List of instruments and measuring devices used in the survey: laser rangefinder, camera, roulette, caliper, strength meter of concrete, bricks and mortars, measuring devise for the protective layer of concrete  and the diameter of reinforcements in reinforced concrete and other devices

  • General characteristics of the shelter:

    • Object description and current usage of the structure (civil defence shelter, bomb shelter, bunker, etc.)

    • Topographic plan and location (street, area, under the existing building, near the building or structure, etc.)Information about the protective structure according to the passport (class/classification of the shelter, capacity (people), area (m2), volume (m3), more detailed information is provided in the technical document.

    • Volumetric planning characteristics – shape, staircases, exits and their location internally and externally.

    • Design criteria - the structural scheme of the structure, foundation, external and internal bearing walls of the building. Dividers, covering of the building, stairs to the shelter, earth coverage on the top, floors, interior decoration of the surfaces, inner doors in the premises, waterproofing of walls and floors and other.

    • Description of the engineering systems: water supply, drainage, heat supply, power supply, ventilation.

 

Results and analysis

  • Technical condition of the structural elements

  • Technical condition of the engineering systems

  • Technical condition of the special protective devices

 

Methods of testing and research and applicable standards / norms

  • Methods for determining the strength of materials

  • Methods for determining the geometric dimensions of the structures and the parameters of their reinforcement

  • Norms and standards for protective and life support equipment


Conclusions and recommendations


References and regulations


Shelter renovation examples


Replacement of blast doors and civil defence shelter renovation. Special retrofit doors designed with frame that can be welded or bolted to the old existing frame or concrete wall opening.
Replacement of blast doors and civil defence shelter renovation. Special retrofit doors designed with frame that can be welded or bolted to the old existing frame or concrete wall opening.

Modernization of old CBRN filtration and ventilation system with modern components like filters, blowers and valves.
Modernization of old CBRN filtration and ventilation system with modern components like filters, blowers and valves.

Visit in the civil defence shelter after renovation process and restoration of engineering infrastructure and technical solutions.

If you are planning a shelter renovation project or modernization of existing shelters contact us to get a professional consultation and comprehensive solutions for all shelter components.